CIM Brochure
CIM Display: Concept 1 (3 MB)
CIM Display: Concept 2 (3 MB)
CIM Presentation
OLR Design Survey (Print and Mail/Deliver)Survey
Online OLR Design Survey
CIM2 Display (3 MB)
CIM2 Presentation (1 MB)
Public Hearing Brochure
Project Display
Summary of Comments
Old Lynchburg Road
General Acceptance of Major Preliminary Design Elements:
Sidewalk alignment from Middle Road to J.P.A.
Traffic & Pedestrian safety measures along the entire corridor
Drainage system alignment along entire corridor
Alternate bike route designation through Azalea Park trails and Monte vista Ave. to J.P.A.
Major Design Elements still under review
Developing a storm water quality, BMP concept that could be located at FSBC property.
Additional investigation into moving the sidewalk alignment from Azalea Park entrance to Middleton Road on the west side, at the request of adjacent property owners.